Maintenance Window: Sunday, 11/10/2019 9pm MST to 11/11/2019 2am
Detail: We’ll be testing failover and failback environments, with a minimal downtime expected during the entire event
Visible Changes: There is a possibility your Epicor system will be unavailable for short periods during this maintenance window.
After the update: We’ll have 100% confidence in our improved RPO and RTO’s for same site failover.
We will be scheduling another DR testing for our hot site failover later this month.